The St. Franziskus district hospital in Saarburg has determined a location for a new building as part of a feasibility study. This is necessary due to the expansion of the hospital portfolio. In the course of this, the hospital's existing structure is also being rebuilt and restructured in a sustainable manner. Today's campus extends on a hillside along Graf-Siegfried-Strasse in Saarburg. The new building site was examined in terms of planning and function and was selected as the ideal area for an expansion of the campus in variant planning. A container extension, which was once necessary as an interim operating room, still stands here today. This will be dismantled in advance. Before the start of the feasibility study, the idealized room and function program was agreed with the ministry. The result of the feasibility study is attached to the tender documents.
The planning services should be awarded subject-specific.
The subject of this lot 01 is the property planning services for buildings according to § 34 HOAI.
The service phases 1-9 according to § 34 HOAI as well as special services are advertised.
The awarding agency intends to award these planning services in stages.
In performance level 1, performance phases 1 to 2 according to HOAI as well as the special services required in these phases should be commissioned.
In performance level 2, the performance phases 3 to 4 according to HOAI as well as the special services required in these phases are to be commissioned.
In performance level 3, the issuing body intends to award performance phases 5 to 9 according to HOAI as well as the special services required in these phases.
The services based on performance level 1 are optionally advertised.
There is no legal entitlement to the commissioning of further services / levels.