Electrical planning including execution planning and delivery of charging infrastructure for the operation of battery-electric low-floor buses (depot and occasional chargers) at the depot in 2023 and at final stops in 2024 as well as backend and diagnostic system; Loading and load management for the Diedrichstraße depot; System and Component Training
Electrical planning including execution planning and delivery of charging infrastructure for the operation of battery-electric low-floor buses (depot and occasional chargers):
1. 45 charging points (150 kW each) incl. cable laying and enclosures (steel containers) of the transformers and the electrotechnical components of the charging stations for the Diedrichstraße depot in 2023 2. Final stop Schilksee, Olympic Centre: Four pieces of Opportunity Charger charging points (each 500kW) with traverse over 18m light width to accommodate the charging hoods and charging stations enclosed in concrete containers, each with a toilet system in 2024 3. Final stop Roskilder Weg: Three opportunity charger charging points (each 500 kW) at individual masts and charging stations enclosed in concrete containers, each with a toilet system in 2024 4th final stop StrandOrt: Four pieces of Opportunity Charger charging points (each 500kW) with traverse over 12m light width to accommodate three charging hoods and a single mast for the fourth charging point and charging stations enclosed in concrete containers with a toilet system each in 2025 In addition: Backend and diagnostic system; Loading and load management for the Diedrichstraße depot; System and component training for different groups (in 2023); Service and maintenance contract