Planning, production, delivery, installation, commissioning, trial operation, documentationn and service of WTG´s for an OWF.
Planning, production, delivery, installation, commissioning, trial operation and documentation of WTG for an OWF with a total output of approximately 900 MW including wind farm SCADA and service contract. The project is located within the Exclusive Economic Zone (EEZ) of the North Sea, about 85 km north of the island Borkum and 95 km west of the island Helgoland. The used WTG type should have at least a power of 7 MW. Detailed specifications, technical employers requirement, design basis and contract are made known with the submission of the tender documents. The final order is u.a. depending on legal framework conditions, permits, the network connection as well as the investment decision. The contract is scheduled for mid-2021. Commissioning is expected to take place by 2025 at the latest.