Refurbishment and extension of an existing school:
- 2 600.00 m 2 single-layer mastic asphalt,
- 40.00 m 2 two-ply mastic asphalt ground, supplied as floating screed incl. insulation and installed.
See "Short description".
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.