Lot 5_ B180_Neubau BW 5Ü (economic path bridge) incl. production of economic route 5.2
The following key benefit is included in the tender:
New bridge building A = 140 m², total width = 6.50 m
-approx. 1,300 m³ excavation of the excavation pits,
-approx. 900 m³ delivery/installation of codible ground building backfill
-approx. 450 m³ delivery/installation of coarse-grained floor building backfill
-ca. 650 m³ delivery/installation bulk material for embankment cones
- approx. 170 m³ reinforced concrete foundations
-approx. 435 m³ reinforced concrete abutment and wing
-approx. 65 m³ reinforced concrete superstructure, in-situ concrete addition, composite precast panels
-approx. 14 m³ reinforced concrete caps
- approx. 19 m³ reinforced concrete tow plates
-approx. 64 t delivery/assembly of 2 composite prefabricated parts
Steel hollow boxes with concrete top chord, prefabricated part length: 23.2 m
Rural pathway construction:
- approx. 1,700 m² production of commercial road in asphalt construction
- approx. 1,900 m² production of commercial routes with unbound building materials