The overall construction assignment includes the construction of 101 public housing for 6-storey independent buildings, 54 for general and senior housing as well as 36 owner-occupied housing located in a 19-storey high-rise building. For this, relevant parking areas are established in basement and terrain.
Roofing (TA)Hot-roof structure and roof terraces incl. coatings, fall protection systems and skylights.
Masonry Works (MU)Roofing of facades.
Carpentry Works (TØ)Plaster walls, ceilings in common areas, interior doors.
Wood / AluDelivery of windows and doors.
Painting (MA)Coatings, ceilings and interior woodwork
HVAC installations (HVAC)Heating, water as well as sewage systems.
Ventilation (VE)Decentralized ventilation of housing incl. smoke ventilation in basement
Electrical installations (EL)Power, low-power networks, antenna installations, and ABDL. incl. detailed design.
PhotovoltaicsDelivery and mounting of solar cells incl. retail design and enrollment.