Engineering design services | Tenderlake

Engineering design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 February 2023
Closing Date:
20 March 2023
Location(s):
DE948 Cloppenburg (DE Germany/DEUTSCHLAND)
Description:
KA CLP Procurement Digestion

The city of Cloppenburg operates a municipal sewage treatment plant with a high proportion of industrial dischargers (in total approx. 190,000 PE) and was recently upgraded to the current state of the art in the course of the extensive 6th expansion measure.

Due to age, the structural and technical facilities for sludge digestion (digester I, 4,000 m³ usable volume for anaerobic stabilization, digester II, 4,000 m³ usable volume, shut down > 30 years) are obsolete and must be renewed.

On the basis of a preliminary engineering investigation for the replacement of the sludge digestion, the site specifications have already been worked out and various variants discussed (see Appendix 1).

On the basis of the available documents, the planning process for the replacement of the sludge digestion plant is to be started and accompanied until the final implementation of the measure. Extensive engineering services for object planning (civil engineering structures and traffic facilities) as well as for specialist planning (structural design and technical equipment) will be tendered on the basis of the HOAI 2021.

The services required for clearing the construction site are put out to tender separately and awarded to a specialist planner for building demolition.

The commissioning of the various services takes place in stages. The following calls are planned:

Service package 1: up to and including LP 3 for object planning and specialist planning

Service package 2: LP 4 for object planning and specialist planning

Service package 3: LP 5 to LP 7 for object planning and specialist planning

Service package 4: LP 8 to LP 9 for object planning and specialist planning

The performance profile of the engineering services to be awarded according to the HOAI 2021 includes the following points:

HOAI 2021 - Part 3 Object Planning, Section 3 Civil Engineering Structures

- Service package 1

- Special service "Intensive review of the existing documents with regard to possible deficits related to the performance target of performance phases 1 and 2 according to § 43 HOAI 2021 in conjunction with Annex 12"

- Implementation LP 1 according to § 43 HOAI 2021 in conjunction with Annex 12

- special service "Verification of the pipeline inventory on site on the basis of the documents handed over by the AG incl. documentation in the form of a short report"

- Implementation LP 2 according to § 43 HOAI 2021 in conjunction with Annex 12

- special service "Further processing of the verified pipeline stock into a technically integrated master plan for the sludge digestion plant segment (existing media lines, media lines to be abandoned, new media lines)"

- Implementation LP 3 according to § 43 HOAI 2021 in conjunction with Annex 12

- Special service "Scheduling of the planning phase with the involvement of the other parties involved (e.g. object planning traffic plant, technical equipment planning, structural planning, ground surveyor, specialist planner building demolition, etc.)"

- Special service "Coordination of the entire project with the involvement of the other experts (e.g. object planning traffic plant, technical equipment planning, structural planning, ground expert, specialist planner building demolition, etc.)"

- Service package 2

- Implementation LP 4 according to § 43 HOAI 2021 in conjunction with Annex 12

- Service package 3

- Implementation LP 5 according to § 43 HOAI 2021 in conjunction with Annex 12

- Implementation LP 6 according to § 43 HOAI 2021 in conjunction with Annex 12

- Implementation LP 7 according to § 43 HOAI 2021 in conjunction with Annex 12

- Special service "Scheduling of the planning and tendering phase with the involvement of the other parties involved (e.g. object planning traffic plant, technical equipment planning, structural planning, ground surveyor, specialist planner building demolition, etc.)"

- Special service "Coordination of the entire project with the involvement of the other experts (e.g. object planning traffic plant, technical equipment planning, structural planning, ground expert, specialist planner building demolition, etc.)"

- Service package 4

- Implementation LP 8 according to § 43 HOAI 2021 in conjunction with Annex 12

- Special service "Superordinate coordination of the other project participants, in particular the other object and specialist planning that is carried out within the framework of the overall construction contract"

- Special service "Supplement Management"

- Special service "cost control"

- Special services "local construction supervision"

- Implementation LP 9 according to § 43 HOAI 2021 in conjunction with Annex 12

- special service "Monitoring of the remedy of defects within the limitation period"

HOAI 2021 - Part 3 Object Planning, Section 4 Traffic Facilities

- Service package 1

- Implementation LP 1 according to § 47 HOAI 2021 in conjunction with Annex 13

- Implementation LP 2 according to § 47 HOAI 2021 in conjunction with Annex 13

- Implementation LP 3 according to § 47 HOAI 2021 in conjunction with Annex 13

- Service package 2

- Implementation LP 4 according to § 47 HOAI 2021 in conjunction with Annex 13

- Service package 3

- Implementation LP 5 according to § 47 HOAI 2021 in conjunction with Annex 13

- Implementation LP 6 according to § 47 HOAI 2021 in conjunction with Annex 13

- Implementation LP 7 according to § 47 HOAI 2021 in conjunction with Annex 13

- Service package 4

- Implementation LP 8 according to § 47 HOAI 2021 in conjunction with Annex 13

- Special service "Supplement Management"

- Special service "cost control"

- Special services "local construction supervision"

- Implementation of LP 9 according to § 47 HOAI 2021 in conjunction with Annex

- special service "Monitoring of the remedy of defects within the limitation period"

HOAI 2021 - Part 4 Technical Design, Section 1 Structural Design

- Service package 1

- Implementation LP 1 according to § 51 HOAI 2021 in conjunction with Annex 14 Implementation LP 2 according to § 51 HOAI 2021 in conjunction with Annex 14

- Implementation LP 3 according to § 51 HOAI 2021 in conjunction with Annex 14

- Service package 2

- Implementation LP 4 according to § 51 HOAI 2021 in conjunction with Annex 14

- Service package 3

- Implementation LP 5 according to § 51 HOAI 2021 in conjunction with Annex 14

- Implementation LP 6 according to § 51 HOAI 2021 in conjunction with Annex 14

- Service package 4

- Special service "reinforcement acceptances"

HOAI 2021 - Part 4 Technical planning, Section 2 Technical equipment

- Service package 1

- Intensive review of the existing documents with regard to possible deficits related to the performance target of performance phases 1 and 2 in accordance with § 55 HOAI 2021 in conjunction with Annex 15

- Implementation LP 1 according to § 55 HOAI 2021 in conjunction with Annex 15

- Implementation LP 2 according to § 55 HOAI 2021 in conjunction with Annex 15

- Implementation LP 3 according to § 55 HOAI 2021 in conjunction with Annex 15

- Service package 2

- Implementation LP 4 according to § 55 HOAI 2021 in conjunction with Annex 15

- Service package 3

- Implementation LP 5 according to § 55 HOAI 2021 in conjunction with Annex 15

- Special service "Checking and recognizing formwork plans of the structural engineer for conformity with the slot and breakthrough planning"

- Implementation of LP 6 according to § 55 HOAI 2021 in conjunction with Annex 15

- Implementation of LP 7 according to § 55 HOAI 2021 in conjunction with Annex 15

- Special service "Participation in the examination of offers justified by the construction industry (claim defense)"

- Service package 4

- Implementation of LP 8 according to § 55 HOAI 2021 in conjunction with Annex

- special service "accompaniment of commissioning process"

- Implementation of LP 9 according to § 55 HOAI 2021 in conjunction with Annex

- special service "Monitoring of the remedy of defects within the limitation period"

With regard to the basic service (HOAI 2021 - Part 4 Technical planning, section 2 Technical equipment according to Appendix 15, the performance phase 8, indent e) as well as the special service "Participation in the examination of construction-justified offers (claim defense)" or "Supplement management", the following activities must be taken into account:

- Examination of additional cost registrations incl. clarification of the technical necessity

- Leading an additional cost / addendum

Download full details as .pdf
The Buyer:
Stadt Cloppenburg
CPV Code(s):
71320000 - Engineering design services