Renovation of Teckschule Wernau (3.BA) and renovation of kindergarten "Haus des Kinder" - plastering and stucco work
The construction site is located in the area of the area of the "Teckschule".
The school building is to be completely renovated in 3 construction phases, the subsequent kindergarten "House of the Child" is also to be renovated.
The present list of services includes the work in the 3rd construction phase of the school building (extension basement and ground floor) as well as in the kindergarten "House of the Child" (ground floor).
It is a solid building from the 1960s.
School building area
Outer walls:
Masonry, concrete
Cover:
via basement: ribbed ceiling and concrete ceiling
above ground floor: ribbed ceiling
Kindergarten area
Outer walls:
Masonry, concrete
Cover:
above ground floor: reinforced concrete ribbed ceiling and concrete ceiling
The building services are completely renewed.
The building envelope (windows, roof surfaces and facades) will be preserved. Floor plan changes and modernizations are made.
In the buildings adjacent to the construction site, school operations will continue.
Extent of the work:
Teckschule:
- Test substrate approx. 216 m2
- Side plastering window ledges (inside) 19 pieces
- Gipsputz ca. 119 m2
- Lime-cement plaster approx. 97 m2
- Doppelständerwände ca. 10 m2
- Schachtwände F90 ca. 12 m2
- Fire protection stones approx. 5 pieces
Child's house:
- Subsoil check approx. 186 m2
- Side plastering window ledges (inside) 14 pieces
- Gipsputz ca. 186 m2
- Metallständerwände ca. 24 m2
- Schachtwände F90 ca. 15 m2
- Fire protection stones approx. 5 pieces