2 MW emergency power plant of the type (RUPS)
Press here https://permalink.mercell.com/166172748.aspx
Energnist provides an Emergency Power Plant which ensures continued operation on their incinerators, in the event of a power failure or failure of the supply network.
Therefore, an Emergency Power Plant of 2 MW of the type (RUPS) Rotary UPS facility is offered.
The plant needs to be built up with battery backup that delivers 2 MW in 15 Minutes.
The plant must be built into the 10 KV supply network.
Rearrangement of 10 KV cables as well as work on switching boards are included in the tender.
The supplier shall project, supply and commissioning the complete facility.
Including RUPS, Tablets, Clutch boards before/after RUPS and Bypass Tableboard.
10 kV supply cables must be established between board rooms and emergency power installations.
All technique is placed in cleared area dedicated to the purpose.
The area has the required carrying capacity to carry facility incl.. Batteries
The supplier is in favour of baking the equipment.