sanitary equipment
Drinking water:
The building is supplied with drinking water via a connection to an existing drinking water pipe.
The entrance to the new building is planned via the supply shaft in the technical centre.
Rohrwerkstoff:
Stainless steel with press sleeves.
Decentralised drinking water heating
Rainwater/waste water:
The rainwater is fed to the existing underground pipes via a pressure drainage system and fed into the public sewer.
The dirty water from the sanitary equipment is fed through downpipes to the existing underground pipe connections.
To equalize the pressure, all wastewater downpipes are planned as ventilation pipes up to the roof.
Pipe materials:
- Rainwater: HDPE pipe
- Dirty water: HDPE pipe, PP-MD pipe
masses:
o approx. 550 m stainless steel pipeline incl. fittings and connections
o approx. 380 m sewage pipe PP soundproofed incl. Connections
o Number of furnishings: approx. 50