Architectural and related services | Tenderlake

Architectural and related services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 July 2021
Closing Date:
20 August 2021
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
Framework agreement for architectural and engineering services for technical equipment

Architect and engineering services for technical equipment according to § 55 HOAI in conjunction with annex 15

Lot 1 — Heating/Ventilation/Plumbing/Electrical — Performance Phase 1-9

Lot 2 — elevators — performance phase 1-9.

Heating/Ventilation/Plumbing/Electrical — Performance Phase 1-9

Architect and engineering services for technical equipment according to § 55 HOAI in conjunction with annex 15

Lot 1 — Heating/Ventilation/Plumbing/Electrical — Performance Phase 1-9

The individual projects are usually commissioned in the following project stages or partial services from them:

1st stage: HOAI performance phase 1-7 as well as prorated basic and special services

2nd stage: service phase 8 of HOAI as well as prorated basic and special services,

Stage 3: Service phase 9 of the HOAI as well as prorated basic and special services (including monitoring the remediation of defects within the statute of limitations).

Additional services:

— Involvement in modernization announcement and billing.

Within the framework of the construction plan valid in the current calendar year, individual house engineering systems, such as heating stations, pressure holding systems, water heating systems, heating systems, sanitary strands, ventilation and air conditioning systems, electrical installations (e.g. riser tracks, house alarm and bell systems, lighting systems) are available on a variety of to service buildings (with different types of use). The repair work must be carried out including all ancillary work (for continuous renovation including restoration of kitchen/bathroom areas).

Heating/ventilation/plumbing/electrical:

40 individual construction measures are assumed per construction year.

The selection of the framework contract partners (number 4-5) is based on the fee offer.

The distribution of the individual projects after the award of the contract to the framework contracting parties takes place, if possible, evenly among all framework contracting parties with the emergence of the respective need.

The contractor must be able to process multiple projects in parallel because work on multiple projects can start at the same time during the contract period.

The response time from the retrieval of services to the start of planning has to take place within 14 days.

Elevators performance phase 1-9

Architect and engineering services for technical equipment according to § 55 HOAI in conjunction with annex 15

Lot 2 - Elevators - Performance Phase 1-9

The individual projects are usually commissioned in the following project stages or partial services from them:

1st stage: HOAI performance phase 1-7 as well as prorated basic and special services

2nd stage: service phase 8 of HOAI as well as prorated basic and special services,

Stage 3: Service phase 9 of the HOAI as well as prorated basic and special services (including monitoring the remediation of defects within the statute of limitations).

Additional services:

— participation in modernization announcement and billing,

— Creation of a risk assessment per lift according to BetrSichV.

As part of the construction plan valid in the current calendar year, individual building engineering systems, such as elevators (complete renovation/part renovation/new construction), must be rehabilitated on a large number of buildings (with different types of use). The repair work must be carried out including all ancillary work.

Lifts:

25 individual construction measures are assumed per construction year

The selection of the framework contract partners (number 2-3) is based on the fee offer).

The distribution of the individual projects after the award of the contract to the framework contracting parties takes place, if possible, evenly among all framework contracting parties with the emergence of the respective need.

The contractor must be able to process multiple projects in parallel because work on multiple projects can start at the same time during the contract period.

The response time from the retrieval of services to the start of planning has to take place within 14 days.

Download full details as .pdf
The Buyer:
degewo AG
CPV Code(s):
71200000 - Architectural and related services
71300000 - Engineering services