Water supply construction from the wastewater treatment plant Tauberbischofsheim to the pumping station Impfingen (BA04)
Construction of water pipes DN 300 and DN 400 (underground) including 2 ventilation shafts and parallel cable pipes with cable ducts.
Water supply construction from the wastewater treatment plant Tauberbischofsheim to the Pumfingen pumping station
— 2 parallel lines DN 300/400 GGG ZMU, L = 2 350 m,
— 1 x penetration of waters 1st order (Tauber),
— 1 x new ventilation shaft (duct no 2),
— 1 x new ventilation shaft (duct no 3),
— Installation of cable pipes and cable ducts parallel to the water pipe.