Fire and rescue station 1 in the Hanseatic and University City of Rostock is to be renovated and expanded. The project is divided into 4 construction phases. The preparatory measures (repair, demolition, media supply) and the new construction of the control center building with disaster control warehouses and workshops will be implemented in the BA0+BA1 construction phases that are now being advertised and to be carried out.
The service includes in detail, among other things
Sanitary - approx. 470 m waste water pipes PE-DN 56 - DN 150
- Polymer concrete drainage channels including covers
- approx. 950 m of drinking water and process water stainless steel pipes DN 12 - DN 40
- 2 pcs Redundant safety isolating station
- 8 pcs WC system washdown
- 9 pcs washstand
- 4 pcs Urinals including electronic release
- 7 pcs Hygiene flushes including BLS hook-up
- 13 pcs Instantaneous water heaters from 6.5 — 27 KW
Fire extinguishing technology - approx. 800 m stainless steel pipe from DN 32 - DN 125
- 248 pcs umbrella sprinklers dry
- 90 pcs -T piece stainless steel DN 40
- 500 kg profiled steel construction
Compressed air technology - 1 air-cooled, two-stage, two-cylinder compressor flow rate at 12 bar — 336 l/min
- 1 pcs Refrigerant dryer, volume flow 0.6 m³/min
- approx. 28 m copper pipe from DN 10 — DN 20