ventilation equipment
The municipal council of the city of Offenbach am Main intends to build a three-course primary school in addition to a single-field gym on the site intended for common use in the new Bieber Nord development area. A daycare centre with 6 groups is also to be located on this property.
- Ventilation unit centrally located outside 3 pieces
- Ventilation unit centrally located inside 2 pieces
- Decentralised ventilation unit 81 pieces
- Wickelfalzrohr
- DN100 - DN200: 564 m
- DN250 - DN355: 315 m
- DN400 - DN1000: 16 m
- Ventilation duct + moulded parts 1482 m²
- Ventilation duct for kitchen exhaust air + moulded parts 369 m²
- Fire dampers around 121 pieces
- Fire dampers angular 57 pieces
- Thermal insulation on winding seam pipe 187 m²
- Thermal insulation on duct 507 m²
- Volume flow controller variable 176 pieces
- Air conditioners
- Outdoor units 3 pieces
- Indoor units 7 pieces
- Kältemittelleitung 90 m