Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 October 2023
Closing Date:
24 November 2023
Location(s):
DEB25 Trier-Saarburg (DE Germany/DEUTSCHLAND)
Description:
Renovation and conversion of kitchen building of the former barracks in Saarburg, upper floor and attic

Renovation and conversion of the upper and attic floors of the kitchen building of the former barracks in the city of Saarburg

Lot 20 Demolition and shell construction work

Lot 21 Roofing and carpentry work

Lot 22 Drywall construction work

Demolition and structural work

Lot 20 Demolition and shell construction work

- 7 meter crack plaques 80 x 50 mm, with bridge and cleaning brush

- 4 pieces of dust protection door

- 57 m2 floor protection - lay out milk carton carton

- Line 155 running metres of stair treads with stair protection fleece

demolition work

- 28 linear metres of cuts in load-bearing mixed masonry, single-skinned, wall thickness approx. d=53cm (inside)

- 6.2 m3 wall demolition load-bearing mixed masonry, interior, (single shell), wall thickness approx. d=53cm (enlargement of door opening on the upper floor)

- 3 wall openings in load-bearing mixed masonry – W/H/D = 30/06/53

- 1 piece of steel beam 2 x HEB-160 removal, disposal

- 40 outriggers with heavy-duty supports = 50 kN

- 11 pieces of carrier supports

- 9 m2 demolition screed incl. PE foil, edge insulation strip and EPS insulation construction

- 29 m2 pick-up and disposal of bitumen welding membrane on the reinforced concrete slab

Concrete and reinforced concrete work

- 6 pieces of concrete steel girder support cushion in approx. 53 cm thick inner wall

- 5.7 m2 formwork of the concrete support pads

- 1 piece of openings of the prev. Reinforced concrete ceiling close, up to 0.3 m2

- 20 pieces of openings of the prev. Close reinforced concrete ceiling, up to 0.1 m2

- 828 kg of grouting concrete

- 18 m2 formwork for grouting concrete

Formstahl

- 1 piece of steel support beam HEA 180, S235 (below the reinforced concrete ceiling), L=7.50m

- 1 piece of secondary beam HEA 100, S235 (below the reinforced concrete slab), level to the beam HEA 180, L= 3.10m

- 1 piece of secondary girder HEA 100, S235 (below the reinforced concrete slab), level to the beam HEA 100, L=1.75m

- 1 piece of secondary beam HEA 100, S235 (below the reinforced concrete slab), level with the HEA 100 girder, L=1.35

- 3 steel support beams, 4 x HEB 120, S235 (door widening inner wall), L=2.25 m

masonry work

- 2 m3 brick wall openings, 24 cm, pumice solid stone V12 - 6DF, time-offset work

- 1 m3 masonry, small-format, pumice solid stone V12 - 2DF

Roofing and carpentry work

Lot 21 Roofing and carpentry work

- 6 pieces of dismantling of the roof structure and installation of a rafter replacement for the installation of the new roof windows

- 2 pieces of dismantling of the brick, for the purpose of installation of clay vapor pipe DN 160 and DN 200

- Remove 1 m2 of existing OSB board on collar beam ceiling, small areas, for installation wood change

- 3 linear metres of dismantling of the wooden railing in the roof space, store laterally

- Reinstall 1 running metre wooden railing, L=1.00m, time-offset work

- Dismantle 20 m2 blown-in insulation on reinforced concrete ceiling and in collar beam position, store laterally, for the purpose of wood change installation

- 11 m2 Einblasdämmung wiedereinbauen

- 9 m2 Dispose of excess blown-in insulation

Carpentry

- 6 pieces of solid structural timber KVH-NSI for replacement of roof windows 2 x 80/200 mm x 1200 mm, 1 x 80/200 mm x 1800 mm, = approx. 0.067 m³ KVH-NSI/h

- 1 piece of solid construction timber for replacement of roof windows

- 6 pieces of addition to the vapour barrier and thermal insulation

- 17 pieces of solid construction timber KVH-NSI for replacement of ventilation duct, in collar beam position

- 1 piece of solid construction timber for replacement of ventilation duct

- 15 m2 wood fibre board type OSB 3 E1, d=18 mm, N+F, sanded on both sides (horizontal collar beam position)

Roofing work

- 4 roof windows incl. thermal insulation frames and flashing frames smooth brick

- 2 roof windows with window motor incl. thermal insulation frame and flashing frame smooth brick

- 6 pieces of insulation and mounting frame between roof window and hard sub-roof insulation

- 6 pieces of vapour barrier apron

- 3 pieces of self-regulating ventilation element for hinged windows

- 3 pieces of handle strip white Moisture-controlled external component air diffuser (ALD) for demand-controlled home ventilation.

- 4 pieces of electric roller shutter for roof windows - 0.94 x 1.60m

- 2 pieces of electric roller shutter for electric roof windows - 0.94 x 1.60m

- 1 piece of clay vapour pipe DN 200

- 1 piece of clay vapour pipe DN 160

- 6 pieces of working the roof tiles on roof windows DFF size: 94 x 160 cm

- 2 pieces of re-roofing of the glazing bricks

Trockenbauarbeiten

Lot 22 Drywall construction work

- 1 piece scissor staircase F60, 0.70 x 1.40 m

Fire-resistant metal stud walls

- 225 m² metal double stud wall, thickness 205 mm, F60-A, 2 x 12.5 mm GKFI, Rw = 72.2 dB, MW 2x60 mm

- 295 m² metal double stud wall, thickness 205 mm, F30-AB, 2 x 12.5 mm GKFI, Rw = 72.2 dB, MW 2x60 mm

- 36 m² metal stud wall, thickness 127 mm, F60-AB +M

- 26.5 m² metal stud wall, thickness 125 mm, F60-A, 2x 12.5 mm GKFI, Rw = 61.5 dB, MW 60 mm

- 29 m² metal stud wall, thickness 125 mm, F30-AB, Rw = 61.5 dB

- 115 m² Threshold, Shaft wall, Dicke 80 mm, F60, 2x 15 mm GKFI

- 37 m² Schachtwand F90

Metallständerwände

- 30 m² metal double stud wall, thickness 205 mm, Rw = 72.2 dB

- 185 m² metal stud wall, thickness 150 mm, 2x 12.5 mm GKFI

- 1.5 m² metal stud wall, thickness 125 mm, with 2x 12.5 mm cementitious panels, to close a hatch

- 18.5 m² metal stud wall, thickness 125 mm, 2x 12.5 mm GKFI

- 31 m² metal installation walls - sanitary, double column - lashed

- 112 m² free-standing cladding

- 11 free-standing cladding, as WC cladding

Fire Protection Cladding Steel Elements

- 1.5 m² GM-F steel beam cladding, three-sided, F90, without substructure, single-layer, beam height <600, unfolding < 1000

- 7.5 m² GM-F steel beam cladding, three-sided, F90, with UK with clip, single layer, beam height <600, unfolding < 1000

- 75 m² GM-F steel beam cladding, three-sided, F60, without substructure, single-layer, beam height <600, unfolding <1000

- 15 m² GM-F steel column cladding, four-sided, F60, without substructure, single-layer, unwinding < 1000

Rasterdecken

- 520 m² acoustic ceiling system 625 x 625 mm, glass wool

Fire-resistant ceiling cladding

- 227.5 m² Deckenbekleidung F60 vu, Tragprofil CD 60/27 (500 mm), Massivbauplatte GKF 20 mm + Feuerschutzplatte GKF 12.5mm, horizontal

- 435 m² ceiling cladding F60 vu, support profile CD 60/27 (500 mm), solid construction board GKF 20 mm + fire protection board GKF 12.5 mm, sloping roof

- 71.75 m² ceiling cladding F60 vu, base and support profile CD 60/27, solid construction board GKF 20 mm + fire protection board GKF 12.5mm, horizontal in dormers

- 12 pieces of dormer cladding on the side, large, F60

- 3 pieces of dormer cladding on the side, small, F60

- 6 pieces of window reveal roof window, F60

Fire-resistant metal ceiling

- 49.5 m² metal ceiling F30 - folding system with metal fire protection cassettes, rotating bolt visible

- 29 m wall connection F30AB, direct – longitudinal side

- 5 running metres wall connection F30AB, direct – front side

- 27.5 m wall connection F30AB, longitudinal side, frieze connection with bracket

suspended ceilings

- 8.5 m² suspended ceiling, base and support profile CD 27/60, 12.5 mm GKFI, 68/57dB

- 180 m² Cantilevered ceiling, GKFI 12.5 mm, double profiles CW 50

- 16 m² vertical height offsets with GK panels

Download full details as .pdf
The Buyer:
Verbandsgemeindeverwaltung Saarburg-Kell
CPV Code(s):
45000000 - Construction work
45260000 - Roof works and other special trade construction works
45300000 - Building installation work