Design and construction of demolition, refurbishment and new build works including asbestos removal to form new entrance building and additional teaching and training facilities at Weston College South West Skills Campus. Form of contract to be Design and Build. The project is anticipated to consist of 3 phases (approximately 2 000 000 GBP in value for each phase) however subsequent phases wil be subject to funding, performance and agreement of the College. Phase 1 will consist of the demolition of part of an existing building, part of which is single storey and part of which is two storey. The building contains asbestos, which will need to be removed as part of the project. The existing roof is asbestos cement roof sheets and part of the external walls are cement profiled asbestos sheeting. Internally there is asbestos in pipework insulation. The demolition works involve stripping out finishes and partitions, removal of existing services, breaking out existing concrete slab, retain existing primary steelwork and foundations (to single storey part), remove all external walls, windows and doors. The entire superstructure of the two storey building will need to be deconstructed. Elements of the existing foundations will need to be removed. The refurbishment works consist of new piled foundations, new steel frame, new elevations, new services and new internal walls and finishes to the single storey part to form a single storey Workshop space. The new build works consist of the construction of a new two storey building to adjoin the refurbished Workshop. The construction of the new build will be piled foundations, steel frame, concrete slab, PCC stairs, partitions and blockwork walls internally, mixture of curtain walling and composite panel cladding to elevations. The space will provide a new Reception as well as meeting rooms and teaching space. There will also be temporary works required to address the phased nature of the project i.e. temporary roofing and temporary walling. The area of Phase 1 is approximately 1 250 m2. Phase 2 is the extension and completion of the two storey building commenced as part of Phase 1. The area of Phase 2 is approximately 950 m2. Phase 3 is the refurbishment of the remaining existing building to form Workshop space. This space adjoins the Workshop space refurbished as part of Phase 1 and the new two storey building. The area of Phase 3 is approximately 1 500 m2. With regard to programme, Phase 1 is anticipated to be 9 months on site. Phases 2 and 3 are anticipated to be of a similar duration on site.