structural work
Excavation work topsoil approx. 9840 m³
Excavation work soil, homogeneous area E3 approx. 14580 m³
Excavation work excavation pit approx. 39500 m³
Soil/rock trench approx. 1300 m³
Dispose of excavated material approx. 3700 t
Flat surface, geotextile fleece base plate approx. 4600 m²
Backfilling workspaces, floor laterally stored approx. 1930 m²
Flat surface, geotextile fleece for special foundation engineering work approx. 6600 m²
Boreholes bored piles approx. 1900 m
Betonstabstahl Pfahlbewehrung ca. 109 t
Micropfähle ca. 416 m
Bohrträgerverbau d ca. 75 cm ca. 1490 m
Steel beam approx. 119 t
Spritzbetonausfachung Trägerbohrwand ca. 1220 m²
Temporary injection anchor approx. 4000 m
Complete demolition of single-storey building, carport psch 1
Perimeterdämmung XPS 0,040W/mK D 120mm PB-ds ca. 3400 m²
In-situ concrete of the cleanliness layer Bopla C16/20 D 5 cm approx. 3400 m²
In-situ concrete floor slab C30/37 D 25-30cm approx. 1100 m³
In-situ concrete wall C30/37 D 20-40cm approx. 1280 m³
Formwork wall H up to 3.50m "S2" approx. 4900 m²
Formwork wall H over 3.50 to 4.80m "S2" approx. 6410 m²
Formwork column rectangular H up to 4.50m "S2" approx. 1920 m²
In-situ concrete column C50/60 XC1 WO approx. 210 m³
In-situ concrete ceiling slab C30/37 D 25-35cm XC1 WO approx. 5900 m³
Formwork ceiling H 2.50-3.50m and H 3.50-4.50m approx. 16700 m²
Reinforcing steel B500B, all diameters approx. 1420 t
Prefabricated flights of stairs D18cm Running width 140cm C30/37 26 pcs
Waterproofing wall with thick bitumen coating approx. 1800 m²
Perimeter insulation XPS-PW-dh-040 D 140 mm walls approx. 1100 m²
Masonry interior wall D 17.5 cm KS-R P H 3.50 to 4.50 m approx. 2730 m²
Ground pipes sewage approx. 410 m
Spiral collector installation in foundation piles D80cm /L10 + 15m approx. 101 pcs