The city of Pinneberg is planning a separate extension for the existing school building for the primary school Rübekamp in Pinneberg. For the implementation of the new building, existing residential buildings, which are in the hands of the city of Pinneberg, will be dismantled. The new building will be designed as a separate 2-storey building without cellar on Schauenburgerstraße with an internal patio (inner courtyard) in solid construction. The outer walls are given a multi-layer wall structure with a clinker facing shell and continuous honrizontal pilaster tape.
Sustainable building planning is based on the motto "School has a role model function". which is why sustainable materials are also used and the planned flat roof is greened. The federal government's guidelines for sustainable building must be observed.
The scope of services of the advertised service "Electrical, communicating.- safe and info-techn. Annexes' comprises:
- Cost group 440 Electrical installations with emergency lighting, main power supply, distribution systems, laying systems, concrete installation work, electrical circuit lines and cables, installation services, equipment connections, lighting control, control, sun protection, drilling, chiseling and milling work, fire protection, construction electricity, other, interior lighting, exterior lighting, surge protection and equipotential bonding systems
- Cost group 450 Communication- secure- and info-techn. Systems with intercom, disabled toilet emergency call system, bell system, clock systems, hearing impaired systems, fire alarm system, voice alarm system (SAA), telephone and data network, SHEV, and other
The construction site access is via Schauenburgerstraße, via the existing parking space of the Rübekamp sports hall.
The primary school will continue to teach throughout the entire construction period. If necessary, there may be individual votes for the execution during the school operation.