Lichtbergschule Eiterfeld, new administration building - interior plastering
The client is planning the construction of a new building for administration in Eiterfeld as part of the overall measure for the new construction of the Lichtberg School Eiterfeld, as an early partial construction measure of an existing 3-storey primary school building, which is being built in monolithic construction. The building block to be created is a very easily structured building mass.
Component management - 43.5 m x 14.5 m
Storeys: 2 full storeys
Short description of tradeshow: interior plastering work LB 023
masking windows approx. 200 square meters
Adhesive bridge on concrete approx. 420 sqm
Plaster finishing rails approx. 100 linear metres
Corner rails approx. 60 linear metres
Glass fabric plaster reinforcement approx. 100 m²
Gypsum plaster Q2 smooth peeled approx. 1,070 m²
lime cement plaster on concrete approx. 70 square meters
window reveals approx. 60 linear meters
wall slits approx. 30 linear meters