The limited number of characters in point II.1.1) makes it impossible to give the full name of the order, therefore the name of the order is given in point II.1.4):
"Construction of the S10 Szczecin – Piła road on the section end of the Stargard bypass – the beginning of the Piła bypass (with the "Košice" node) excluding the bypass of Wałcz, Section 2: the "Stargard Wschód" node (without the node) – the "Suchań" node (without the node)".
As part of the subject of the contract, the contractor will be obliged to perform design services and construction works in accordance with Polish law, in particular with technical and construction regulations, regulations on independent technical functions in construction and regulations on products and materials used in construction.
"Construction of the S10 Szczecin – Piła road on the section end of the Stargard bypass – the beginning of the Piła bypass (with the "Košice" node) excluding the bypass of Wałcz, Section 2: the "Stargard Wschód" node (without the node) – the "Suchań" node (without the node)".
The scope of the task includes in particular:
1. development of project documentation and obtaining a ZRD decision,
2. construction of an expressway,
3. Krąpiel road junction,
4. linking to the existing node "Stargard Wschód"
5. reconstruction of existing roads in the scope of collision with the expressway,
6. construction of roads other than expressways, including changes in the route of existing roads,
7. construction of additional roadways,
8. construction and/or reconstruction of infrastructure for pedestrians and cyclists,
9. construction of the ILO with a leisure and service function,
10. emergency crossings and emergency entrances to the expressway,
11. technological belts,
12. engineering structures along the expressway and along the roads intersecting with the expressway,
13. land drainage system,
14. environmental protection equipment,
15. removal from the construction site and disposal of any identified plants that are invasive alien species,
16. removal from the construction site and utilization of waste identified in the previously developed documentation,
17. infrastructure for the needs of expressway facilities,
18. reconstruction of conflicting equipment and existing network,
19. demolition of buildings and structures, demolition of road elements, culverts and others,
20. teletechnical network for the needs of the Ordering Party,
21. road lighting,
22. traffic organisation, including road safety equipment,
23. cleaning and clearing existing drainage equipment and receivers,
24. works resulting from the need to connect the section to the existing communication system,
25. Traffic Management System,
26. Strengthening the subsoil and ensuring the stability of slopes.
The Contracting Authority reserves the obligation of the Contractor to personally perform key tasks, i.e.: the surface of the main route, including the manufacture and incorporation and execution of other layers of paving structures above native soil (excavation) or embankment soil (embankment), excluding supplies of materials and services.
Total estimated order of magnitude of contract value above €20,000,000.