The work to be designed and carried out concerns the restructuring of 17 practical work rooms in the 4TP4 building.
The floor area of the existing building is 3,270 m
The building will mainly house five services:
- a molecular biology service;
- an animal biology service;
- an animal physiology service;
- a Neurosciences service;
- a Genetics / Developmental Biology service;
- additional rooms made up of five storage areas and a preparation room for animal husbandry, two storage areas for hazardous products, three freezer and fridge rooms;
- technical and sanitary rooms.
The share of the financial envelope allocated to the works by the contracting authority amounts to
4,430,000.00 EUR excl.
The contractor will be entrusted with a basic mission (including SSI mission) supplemented by:
- inventory of fixtures with statement of existing (partial DIAG);
- quantitative quantities (partial EXE), summary (partial EXE), and
- the following additional assistance missions:
—— determination of operating and maintenance costs, analysis of the overall cost of the structure;
—— summer comfort analysis with thermodynamic simulation;
—— maintenance and commissioning with drafting of specifications.
As a forecast, the project management mission should start on 16.11.2020.