The dam school in Heilbronn, which was built around 1906, has to undergo a general renovation. The school building essentially corresponds to the original condition at that time. As part of the renovation, the deficient floor ceilings must largely be replaced and replaced with new concrete / sheet steel composite ceilings. In this course, urgently required measures are carried out on windows / facades, technical installations, room acoustics, etc. (renovation backlog).
- Linoleum flooring finely marbled 1,500 m
- Grind screed surfaces / level surface 2,000 m
- Hardwood skirting board painted 1 140 m.