Brücke Lohring - BW Nr. 145 (ALT)
Dismantling of the bridge
-Brückenlänge ca. 105 m
-Clear width approx. 11.2 m
The superstructure consists of seven fields, built in 1909 concrete slab beams 5 fields, built in 1929 WIB 1 field, built in 1974 concrete slab 1 field.
The substructures are made of in-situ concrete, the southern abutment was constructed as a bored pile wall.
Under the bridge there are electrified systems of DB-Netz AG that are in operation.