Dachabdichtungsarbeiten
- Demolition work on roof surfaces of the existing building (approx. 3,800 m2)
- New roof structure bituminous with MF insulation. D = 200 mm i.M. (approx. 3,800 m2)
- Extensive green roof, including gravel strips and maintenance paths (approx. 3,800 m2)
- Load-held securant systems with rail guide (approx. 415 m)
- Metal construction work, sloping glazing and shed roofs, incl. louvre windows and partial glare protection (approx. 300 m2)
- Standing seam roof cladding and wall cladding, incl. UK and insulation (approx. 90 m2)
- SHEV domes, smoke lifts and roof hatch (8 pcs.)
- Lightning protection (approx. 3,800 m2)