A new energy center must be delivered, installed and put into operation. The main steam line from the boiler is replaced. The turbine, with generator and gearbox and all withdrawals and taps is to deliver. The network integration takes place via a newly created block transformer. The exhaust steam is condensed by means of a newly created air condenser. The feedwater tank is to be replaced, including two electric and one steam driven feedwater pump. The steam distribution for medium and low pressure must be renewed. The condensates must be collected in a main and a secondary condensate tank and redistributed by means of pumps. For details see scope of delivery and services.
A new energy center must be delivered, installed and put into operation. The main steam line from the boiler is replaced. The turbine, with generator and gearbox and all withdrawals and taps is to deliver. The network integration takes place via a newly created block transformer. The exhaust steam is condensed by means of a newly created air condenser. The feedwater tank is to be replaced, including two electric and one steam driven feedwater pump. The steam distribution for medium and low pressure must be renewed. The condensates must be collected in a main and a secondary condensate tank and redistributed by means of pumps. For details see scope of delivery and services.