Structural work.
— 1 psch own construction site facility,
— 507 m³ soil excavation,
— 1 490 m³ replenishment and supply of compactive material,
— 322 m³ replenishment of soil,
— 50 m³ pipe trench excavation,
— 130 m waste water base pipes made of PP pipe,
— 130 m pressure test of basic lines,
— 751 m
— 830 m
— 399 m³ reinforced concrete foundation slab,
— 107 m
— 74 m³ pits made of WU concrete
— 141 m
— 81 t reinforcement for foundation,
— 94 stamping reinforcement,
— 364 m³ reinforced concrete walls,
— 2 898 m
— 34 openings in walls,
— 28 t reinforcement for walls,
— 20 m³ reinforced concrete columns,
— 179 m
— 5.8 t column reinforcement,
— 494 m³ of reinforced concrete slabs.
— 1 419 m
— 337 m edge formwork for ceilings
— 111 St. dowel bars,
— 73.5 t of slab reinforcement,
— 2 pcs. precast stair runs,
— 734 m
— 31 m pillars made of sand-lime stone,
— 23 pcs. openings in sand-lime brick walls,
— 11 m
— 67 m
— 67 m
— 1 psch staging of the building,
— 4 pcs. meter cracks,
— 40 m fall protection,
— cancel 65 m of sewer pipe,
— 930 m³ line ditch excavation,
— 930 m
— 780 m³ gift backfill,
— 502 m drainage pipe DN 110-DN 500,
— 430 m leak test,
— 12 pcs. precast concrete shafts,
— 6 pcs. shaft crash,
— 90 m drinking water pipe,
— 930 m cable pull trays HD 110-HD 160,
— 9 pcs cable pull shafts,
— 80 m cable protection pipes DN 110,
— 625 m telecommunications line type A2Y (L) 2Y 10 x 2 x 0.6,
— 625m telecommunication lines type A2Y (L) 2Y 100 x 2 x 0.6
Planning services:
— Static evidence and workshop plans for prefabricated stairs?
— BIM based working method.