Electrical installation work of electrical distribution apparatus | Tenderlake

Electrical installation work of electrical distribution apparatus

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 September 2023
Closing Date:
31 October 2023
Location(s):
DE123 Karlsruhe, Landkreis (DE Germany/DEUTSCHLAND)
Description:
Fürst-Stirum-Klinik Bruchsal - New building Building D - Strong and weak current

The new building Building D will be built between buildings C and E. The building has 5 storey levels from the site as well as an attached roof centre. On the north-west side, the building cantilevers with operating theatre and technical floors in the 1st floor. and 2nd floor off (drawer).

The new structure connects to the crossbar of component C 2 in all levels. The new building D is accessed on the same level via the C connection building. The existing elevator C connection is being renovated and is to be expanded to two elevators. The D building has a necessary staircase in each case.

The façade of the new building will be continued in the design of the existing building. The cantilevered structure is equipped with a façade made of compact panels with vertical aluminium slats as sun and privacy protection.

The levels of the new building D (E -1 to E 4 and technical superstructures E 5) each form fire subsections /

Smoke sections. In some areas, usage units will be realized. Smoke extraction from the corridors is carried out via corridor windows or adjacent areas or a SHEV in the ceiling cavity.

LV:

1. KG 440 - Power installations

2. KG 450 - Low-voltage installations

3. KG 470 - User-specific systems

4. KG 490 - Other measures for technical installations .

5. Others

6. I&C cabling

7. Maintenance

Download full details as .pdf
The Buyer:
RKH Kliniken des Landkreises Karlsruhe gGmbH, Fürst-Stirum Klinik Bruchsal
CPV Code(s):
45317300 - Electrical installation work of electrical distribution apparatus