The new building Building D will be built between buildings C and E. The building has 5 storey levels from the site as well as an attached roof centre. On the north-west side, the building cantilevers with operating theatre and technical floors in the 1st floor. and 2nd floor off (drawer).
The new structure connects to the crossbar of component C 2 in all levels. The new building D is accessed on the same level via the C connection building. The existing elevator C connection is being renovated and is to be expanded to two elevators. The D building has a necessary staircase in each case.
The façade of the new building will be continued in the design of the existing building. The cantilevered structure is equipped with a façade made of compact panels with vertical aluminium slats as sun and privacy protection.
The levels of the new building D (E -1 to E 4 and technical superstructures E 5) each form fire subsections /
Smoke sections. In some areas, usage units will be realized. Smoke extraction from the corridors is carried out via corridor windows or adjacent areas or a SHEV in the ceiling cavity.
LV:
1. KG 440 - Power installations
2. KG 450 - Low-voltage installations
3. KG 470 - User-specific systems
4. KG 490 - Other measures for technical installations .
5. Others
6. I&C cabling
7. Maintenance