Landscaping and transport works.
Outdoor facilitiesThe redesign of the Platz der Republik with inner city location includes in lot 1 the new design of the square with water systems, the construction of paths and vegetation-related work. In addition, a skater and parcours facility, as well as additional equipment such as seating, are planned.
Road constructionLot 2 includes the reorganization of the traffic areas with 2 turning systems, a multi-part bus stop, and differently used areas of stationary traffic in asphalt and pavement construction. The measure here also includes the adaptation of traffic engineering systems (LSA) and the lighting equipment.