Supply of drainage gravel 16/32 mm for the production of the dewatering layer and the seepage rigols of the
Basic waterproofing system of the Pinnow DKI landfill, 3rd + 4th construction phase (2022/2023) with a volume of approx. 14,750 t
Supply of drainage gravel 16/32 mm for the production of the dewatering layer and the seepage rigols of the
Basic waterproofing system of the Pinnow DKI landfill, 3rd + 4th construction phase (2022/2023) to the extent of approx. 14,750 t. free construction site
The distribution of the total quantity is carried out according to the construction phase as follows:
- 3rd construction phase 2022: approx. 6,250 t,
- 4th construction phase 2023: approx. 8,500 t.