Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 March 2020
Closing Date:
22 April 2020
Location(s):
DE273 Kempten (Allgäu), Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
FOS-BOS_Electrotechnical system BA 1A

- 1 pc main building distributor;

- 4 floor level distributors;

- 48 media columns including installation distributor;

- 6 pc network cabinets;

- 1 pc central battery system with approx. 440 lights;

- 1 pc electro-acoustic system (ELA) with approx. 175 loudspeakers;

- 1 barrier system consisting of entrance and exit barriers and 2 traffic lights;

- 1 pc ramp heating for approx. 155 m 2nd ;

- 5 pc power supplies with router for KNX;

- 14 KNX / Dali gateway

- 1 pc visualization

- 1 pc door station with color camera;

- 3 RWA control centers;

- approx. 215 m underfloor duct with installation boxes including equipment;

- approx. 82,000 m cables including MSR cabling;

- approx. 48,000 m of low-voltage lines including MSR cabling;

- approx. 4 500 m fiber optic cable;

- approx. 800 interior lights, controllable via KNX or Dali;

- approx. 20 parking lot lights.

In the new building, a main distributor is installed in the basement, from here the sub-distributors are supplied. A media column with sub-distributor is installed in each classroom. In meeting rooms and marketplaces, installation takes place in floor boxes, otherwise usually in the suspended ceiling. The lighting control is largely dependent on daylight and via presence detectors. The structured data cabling independent of service ends in 2 IT rooms and is networked with the existing building. Building automation is implemented via KNX. The emergency lighting is set up with a nominal operating time of 3 hours via a central battery system. The ELA system is used only for announcement and as a gong for the hour change.

- 1 pc main building distributor;

- 4 floor level distributors;

- 48 media columns including installation distributor;

- 6 pc network cabinets;

- 1 pc central battery system with approx. 440 lights;

- 1 pc electro-acoustic system (ELA) with approx. 175 loudspeakers;

- 1 barrier system consisting of entrance and exit barriers and 2 traffic lights;

- 1 pc ramp heating for approx. 155 m 2nd ;

- 5 pc power supplies with router for KNX;

- 14 KNX / Dali gateway;

- 1 pc visualization;

- 1 pc door station with color camera;

- 3 RWA control centers;

- approx. 215 m underfloor duct with installation boxes including equipment;

- approx. 82,000 m cables including MSR cabling;

- approx. 48,000 m of low-voltage lines including MSR cabling;

- approx. 4 500 m fiber optic cable;

- approx. 800 interior lights, controllable via KNX or Dali;

- approx. 20 parking lot lights.

Download full details as .pdf
The Buyer:
ZV Berufliches Schulzentrum
CPV Code(s):
45311000 - Electrical wiring and fitting work
45311200 - Electrical fitting work
45314000 - Installation of telecommunications equipment
45314310 - Installation of cable laying
45314320 - Installation of computer cabling
45316000 - Installation work of illumination and signalling systems
45317300 - Electrical installation work of electrical distribution apparatus