outdoor facilities. Construction site equipment, demolition and disposal of tarry asphalt approx. 700 m², excavate and dispose of Z1.1 to Z2 approx. 2200 m³, ditches approx. 200 m³, box channel approx. 65m, sewer pipes approx. 90 m, edging steel approx. 320 m, concreting work approx. 70 m³, asphalt surfacing approx. 1,300 m², paving concrete pavement approx. 650 m², Lawn joint plaster approx. 250 m², vegetation work approx. 2,000 m²
In general. The building is in flood area. The drywall work is carried out partly in stock (approx. 2,000 m³) partly in the new building approx. (5,700 m³). The roof of the semi-basement two-storey structure is designed as a board stacking ceiling, which does not have a basement, partly
two-storey new building is partly designed as a wooden ceiling partly as a flat ceiling. The outer walls are concreted and the inner walls made of HLZ brick-built. The foundation of the new building is largely carried out as a base plate in various thicknesses.
outdoor facilities. Construction site installation, demolition and disposal of tarry asphalt approx. 700 m², excavate and dispose of Z1.1 to Z2 approx. 2200 m³, ditches approx. 200 m³, box channel approx. 65 m, sewer pipes approx. 90 m, steel edging approx. 320 m, concreting work approx. 70 m³,
Paving asphalt approx. 1,300 m², concrete pavement approx. 650 m², lawn joint paving approx. 250 m², vegetation work approx. 2,000 m²