At the end of the initial consultation, the following lots were declared unsuccessful:
- 07 / Locksmith - metalwork
- 09 / Plastering - painting
- 10 / Interior carpentry - layout
- 13 / Hard flooring - earthenware - resin
- 14 / Thin flooring
- 18 / Electricity - low currents
- 20 / Photovoltaic
- 21 / Geothermal drilling
This consultation concerns lots 7, 13, 14, 18, 20 and 21 but remains linked to the initial consultation for the performance of the services.
Lots 9 and 10 are the subject of a consultation initiated by means of an adapted procedure
locksmith - metalleriethe expected benefits are defined in the consultation file
hard flooring - earthenware - resinthe expected benefits are defined in the consultation file
thin flooringthe expected benefits are defined in the consultation file
Electricity - Current Lowthe expected benefits are defined in the consultation file
Photovoltaicthe expected benefits are defined in the consultation file
geothermal drillingthe expected benefits are defined in the consultation file