Supply, installation and commissioning of two new electrical generating units to replace the two existing machines (Kaplan units) at the ARTHAZ plant
Supply, installation and commissioning of two new electrical production units to replace the two existing machines (Kaplan units) of the ARTHAZ plant and the associated adaptation works.
These include:
-Supplies:
o Two single-adjustable or double-adjustable Kaplan-type turbine units (steering + steerable blades)
Gross drop: 4.60 m;
Nominal flow rate: 16 m3/s;
o Two permanent magnet alternators;
o Two wagon type guard valves;
o Two hydraulic power units
-Benefits:
o General studies;
o Studies of the execution and sizing of the equipment;
o Study of integration into the existing building;
o Site installation;
o Installation of the equipment (excluding GC works) and commissioning of the equipment provided on the Arthaz site;
o Training of EDF staff
This list is not exhaustive. The total scope will be described in a set of specifications that will be attached to the tender file, sent only to the pre-selected candidates at the end of this call for applications.
Services not included in this contract:
- Removal of existing furniture in the factory;
- GC including, among other things, the supply and installation of the water intake gate, the demolition and reconstruction of the civil engineering;
- Command and control and electrical installations