Structural engineering HOAI §49 ff.
planning services Structural engineering
The Neckar-Odenwald district in Mosbach is planning the new building
of an administration building in the centre and close to the city centre
location, as a complement to the existing one there
Administrative location of the district office and under the
Requirement of sustainable, climate-neutral construction. That
topographically challenging area is located opposite the bus
train station and is served by Neckarelzer Straße, Renzstraße,
Scheffelstraße and Martin-Butzer-Straße. The
The new building is an addition to the eight existing
Administrative buildings, which are located on the entire site
distribute. In the centrally located boiler house there is a
Woodchip heating, a CHP and a
Gas peak load boilers, which are mainly connected via a local heating network.
of the buildings with heat. The power supply is
via the customer's own transformer station. The arrangement
of the new structure is carried out on the basis of a
Feasibility study across the slope and is to be carried out both for the
barrier-free overcoming of the slope situation as well as for
barrier-free access to a 4-storey building
from the 1920s. The extension is being built
within a building ensemble, mainly from the
years 1900-1920 and therefore requires from the design a
special creative examination of the
historic former school buildings. Requirements for:
the new building: Different types of offices: Cubicle offices as
Single and double offices, alternatively combination offices, one floor
for mobile working without a fixed workstation / shared desk,
Meeting. Those invited to the bidding process
Participants should be able to complete a small task
on the basis of the feasibility study, the work and
Illustrate the office's approach. Of
Furthermore, the connection of the new building over 3 floors to
to plan the existing building.
The following contract dates are planned: Design planning by
1.6.2024
Submission of the building application by 01.11.2024 and planned
Construction from 03/2025 to 12/2026.
The client expects a conceptually competent
Advice as well as professional commitment in all
Work phases.