The subject of this tender is the creation of an as-built model of the power line for the SuedLink construction project by an engineering firm, hereinafter referred to as AN As-Built. The as-built model is to be calculated on the basis of the surveying data provided by the client, which is provided by individual surveying offices.
can be created precisely and seamlessly. In doing so, the careful merging of the data from
of great importance to ensure an error-free model. This is intended to verify the actual condition of the
Diagram the power line for the planning approval sections A1, A2, A3, A4, B1, B2 (cf. point 1.3 of this specification).
The aim of the as-built model is to create a reliable basis for the operator and
Understand changes during construction compared to the implementation planning. It
enables efficient data-based operation as well as the planning of maintenance and repair work.
The subject of this tender is the creation of an as-built model of the power line for the SuedLink construction project by an engineering firm, hereinafter referred to as AN As-Built. The as-built model is to be calculated on the basis of the surveying data provided by the client, which is provided by individual surveying offices.
can be created precisely and seamlessly. In doing so, the careful merging of the data from
of great importance to ensure an error-free model. This is intended to verify the actual condition of the
Diagram the power line for the planning approval sections A1, A2, A3, A4, B1, B2 (cf. point 1.3 of this specification).
The aim of the as-built model is to create a reliable basis for the operator and
Understand changes during construction compared to the implementation planning. It
enables efficient data-based operation as well as the planning of maintenance and repair work.