The joint municipality of Artland intends to build a new 2-field sports hall with grandstand and adjacent additional gymnastics hall in Badbergen. The measure is divided into 2 construction phases. The 2-field sports hall with a total of 6 changing rooms including showers and side rooms will be built in the 1st BA. The grandstand area is located upstairs.
The additional gymnastics hall with adjacent equipment and storage room will be added to the 2nd BA.
Building data: BRI approx. 17,082 m³; GFA: approx. 2,813 m²
The delivery and installation of the sports floor as a sandwich floor (approx. 1,100 m²) including playing field markings (approx. 4,420 m) as well as linoleum flooring in the equipment rooms (approx. 440 m²) must be provided here; soil waterproofing against soil moisture (approx. 1,345 m²); thermal insulation d= 150 mm; sealing;
For more details, see the tender documents.
construction of a 2-field sports hall with grandstand and additional gymnastics hall in Badbergen;
Performance: Sports floor
- Soil waterproofing against soil moisture approx. 1,345 m²
- Spielfeldmarkierungen ca. 4.420 m
- Flooring - linoleum sports hall flooring d = approx.0 mm, approx. 440 m²
- Sports hall floor without top covering approx. 245 m²
For more details, see the tender documents.