The advertised services essentially include:
- Dismantling and, elsewhere, construction of a temporary bridge for pedestrians and cyclists
- the demolition of the Pleistermühlenweg Bridge No. 78 including abutment
- the new construction of the Pleistermühlenweg Bridge No. 78 including abutment
- the adaptation of the roads (ramps) in front of and behind the bridge
1 St steel superstructure including foreshore bridge and pendulum support (approx. 141 tons) with prestressed concrete roadway slab (approx. 125 m³) Float out and break off
2 pcs Demolition of reinforced concrete abutments
Manufacture and assemble approx. 800 t of steel superstructure
Prepare approx. 2,175 m² of steel surface
approx. 2.175 m² Stahlfläche grundbeschichten
approx. 3.600 m² Stahlfläche zwischenbeschichten
approx. 1,700 m² Stahlfläche deckbeschichten
Produce approx. 610 m² of sealing layer on steel
Produce approx. 360 m² RHD flooring
approx. 300 m to make various metal railings and handrails
Produce approx. 775 m³ of reinforced concrete for abutments (end position and temporary bridge)
Installing approx. 96 t of reinforcing steel for abutments
Approx. 532 running metres of deep foundation
approx. 530 m² of topsoil removal
approx. 610 m² of topsoil covering
Carry out approx. 475 m² surface detection for explosive ordnance inspection
Approx. 1,016 m exploratory boreholes for explosive ordnance inspection
approx. 6,175 m³ of soil
Supplying and installing approx. 8,610 m³ of soil
Manufacture and dismantle approx. 5,580 m² of construction site equipment area from gravel
approx. 7,650 m² of bituminous pavement (including construction roads)
Approx. 6,350 m² of roadways (asphalt)
approx. 110 m curbs, pick up curbs
Pick up approx. 100 m² of paving area
Produce approx. 950 m² of paving surface
approx. 550 m of high boards
Produce approx. 30 m deep shelves
approx. 600 m of gutter
Construct approx. 350 m concrete pipeline (DN 300) incl. shafts