Delivery of catenary masts
For construction phases 3 and 4, contact line - Peiner - steel masts for
Deployment.
The design, dimensions and construction as well as the equipment of
individual masts can be found in the attached mast list and contact line plans
can be found.
The calculation includes the complete finished masts with all system components
and accessories for the delivery of the masts, to construction sites or depot
West to take into account and provide for.
Those not specifically or separately listed and mentioned for production
and design of the masts are required for the individual positions
and will not be paid separately.
The creation of the mast drawings must also be taken into account and with
take into account.
The masts are complete with all necessary and necessary
drill holes, pipes, C-profile rails, galvanizing, color painting, etc., and
all other fastening not listed and mentioned separately -
and to produce and deliver small materials and accessories.
Delivery of the masts to the Waldkircher Straße Stadtbahn construction site or
the Betriefshof West in Freiburg on the intended site or
location, including professional charging and unloading (in the factory and on the
construction site or B H -West Freiburg) as well as transport from the factory to the construction site or Bra - West and all necessary accessories (machines, vehicles,
truck crane, stake car, etc.).