The existing outdoor pool in the Salinental valley will be expanded by the new construction of the indoor pool in order to ensure not only the wellness thermal baths but also the offer of the city of Bad Kreuznach in the form of a sports and family pool.
For the new construction, the existing outdoor pool building with supply and changing area and the technical building will be dismantled and replaced by the planned building.
This new building will include the entrance, changing and shower area and integrate the technology for the outdoor pool area. At the same time, structural and technical measures are being taken to sustainably maintain the existing functionality of the outdoor pool and at the same time to increase its attractiveness. In addition, a new children's pool is being built, which can be assigned to both bath areas.
- GFA: 3,950 m
- BRI: 18 867 m
- Water surface of the outdoor pool: 2 300 m
- Water surface of the indoor pool: 539 m
Swimming pool equipment / stainless steel fitter:
- Sports pool: 1m and 3m diving board, starting base and stainless steel components such as access ladder, ladder bracket, etc .;
- Teaching pool: sign bracket, access ladder, ladder bracket and handrail;
- Parents and children pools: attraction 4 prize, wall-colored windows and dolphin slide;
- Safety equipment: stretcher, first aid kit with contents, emergency kit, mobile swimming pool lift, etc.