Heating plant construction work | Tenderlake

Heating plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 July 2023
Closing Date:
08 August 2023
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
Construction of an energy centre (provision of heating and cooling)

Conversion and expansion of the former US military hospital in Berlin Lichterfelde into the FUBIC innovation center.

The building is centrally located as a free-standing large structure with a base of approx. 60m x 120m on a development site of approx. five hectares. It has two basement floors and six above-ground full floors (ground floor - 5th floor). The upper floors are designed as blocks with dimensions of 20 x 118 m.

The installation of the power center includes:

4 pieces of ice energy storage per 125 m3,

2 heat pumps each with a heating capacity of 600 kW or a cooling capacity of 470 kW,

8 dry coolers each 180 kW,

1 St Steuerungszentrale (Energiemanager),

900 m steel pipe DN15 - DN300 with insulation,

8 pcs pumps,

2 pcs heat exchangers (1.1 MW or 1.4 MW),

6 buffer tanks per 6000 litres

Download full details as .pdf
The Buyer:
WISTA Management GmbH
CPV Code(s):
45232141 - Heating works
45251200 - Heating plant construction work
45331231 - Installation work of refrigeration equipment