Work carried out to make buildings classified ERP accessible and to make disabled people safe against the risks of fire and panic admitted to ERP - Lavoisier high schools in Mulhouse, Schweitzer in Mulhouse - Storck in Guebwiller.
VRD - demolition - structural work - site installationStructural work, adaptation, complete or partial demolition and ancillary works.
AsbestosPre-cleaning before asbestos removal and removal of materials, equipment and materials containing asbestos.
Metal joinery - locksmithLocksmith and metalwork and ancillary works.
Interior carpentryInterior carpentry works and ancillary works.
Plastering - finishesPartitioning work, painting work, and various interior finishes.
Tiles - earthenware - flexible floorsLaying of tiles and earthenware, flexible floors.
ElectricityWork on high and low current electrical installations as part of the PMR compliance of high schools.
Sanitary - heating - ventilationWorks to adapt the premises to people with reduced mobility (PRM) including:
- the removal and evacuation of obsolete equipment not reused in the restructured premises;
- sanitary appliances and accessories necessary for restructured premises;
- collection and evacuation of black water and waste water from replaced or new equipment on existing evacuation networks;
- cold water and domestic hot water connection of replaced or new equipment, to existing networks nearby;
- the movements, modifications or / and replacements of heating equipment necessary for the restructuring of the premises, including various adaptations.
ElevatorCompliance of high school elevators.
Indoor and outdoor signageSupply and installation of interior and exterior signage and ancillary works.