A 10, km 77.393-km 85.87, right RF ,; A 115, km 0.987-km 1.072, building 2-1, left hand RF, maintenance measure - lot 1 route construction.
Partial 1.1: A 10, km 81.95-km 85.87 and A 115 BW 2-1:
- approx. 1 psch construction and dismantling of traffic safety of longer duration A 10 and A 115,
- Approx. 60 300 m longitudinal marking type II, consistently produce, wait and remove film w = 0.15 m,
- Set up, maintain and dismantle approx. 6 140 m of the portable protective device T 1,
- Set up, implement and maintain approx. 4,372 m of portable protective equipment T 3,
- approx. 85 m
- approx. 2 820 m
- approx. 2,510 m
- approx. 500 m
- separate approx. 8 240 m asphalt pavement,
- approx. 58 155 m
- approx. 3,040 m
- approx. 27 830 m
- approx. 23 420 m
- approx. 58 155 m
- approx. 3 420 m
- approx. 7 860 m
- approx. 23 450 m
- dismantle and recycle approx. 2 132 m SE from steel (ESP, EDSP, SuperRailEco),
- produce approx. 1 922 m SE from steel,
- remove approx. 8 190 m longitudinal marking,
- Make approx. 8 240 m longitudinal marking.
Partial 1.2: A 10, km 77.393-85.87 right RF - conservation; A 115 BW 2-1:
- approx. 2 psch traffic safety DI / 5 3n + 3 traffic management,
- approx. 8 hours of traffic safety D III / 2r 3n + 3 traffic management,
- approx. 8 hours traffic safety DI / 6,
- approx. 11 hours of traffic safety D III / 2I,
- approx. 1 psch traffic safety D II / 6,
- approx. 3 psch traffic safety D III / 6,
- approx. 15 400 m longitudinal marking type II temporarily 0.15 m; Foil,
- approx. 9,000 m longitudinal marking type II temporarily 0.15 m, line / gap; Foil,
- approx. 1 000 m longitudinal marking type II temporarily 0.30 m; Foil,
- approx. 3 700 m marking button,
- approx. 5 100 m transportable protective devices including emergency openings T1 / W3,
- approx. 9,800 m of portable protective devices including emergency openings T3 / W2,
- approx. 1 Psch diversion signage AS Ludwigsfelde-West,
- approx. 7 500 m
- approx. 8 800 m
- approx. 54,000 m
- approx. 11,000 m
- approx. 10,000 m
- approx. 17,000 m
- approx. 11,000 m
- approx. 60,000 m
- approx. 5 800 m
- approx. 5 800 m
- approx. 900 m
- pick up about 1 100 m of curbs,
- approx. 300 m
- approx. 200 m
- set approx. 400 m concrete curbs,
- dismantle and build up approx. 1 300 m SE,
- approx. 1 piece of new sign on the cantilever,
- approx. 2 new signs on the sign bridge,
- approx. 13,000 m longitudinal marking 0.15. Foil line / gap,
- approx. 17 000 m longitudinal marking 0.30, film,
- approx. 1 300 m longitudinal marking 0.15, film,
- approx. 2,000 m longitudinal marking 0.15, high solid color,
- approx. 1,000 m longitudinal marking 0.15, cold plastic agglomerate marking,
- approx. 4 pieces of smoothing signal systems / counting loop restoration,
- Dismantle approx. 40 pieces of rest area furniture, store temporarily, set up.