Traction 1: Building automation
Subreport ELVIS ID E63635562
Tract 2: Tech. Insulation / insulation
Subreport ELVIS ID E41624552
Tract 3: Rehabilitation of lifts
Subreport ELVIS ID E63835112
Tray 4: roofing / roofing works
Subreport ELVIS ID E45422178
Traction 1: Building automation
- Information priorities I 5 ISP's,
- about 786 physical data points,
- approx. 10 St. control panels,
- approx. 7900 m cable for MSR cabling,
- Extension of the network of building management systems.
Tract 2: Insulating work
Supply and install insulation
- for TWK, TWW, TWZ approx. 10 500 m DN 12 to DN 100 + Form u. Connecting parts MiWo,
- early RW, approx. 500 m, DN 50-DN 200 + form u. Connecting parts MiWo,
- Heating system approx. 9400 m DN 15 - DN 150 MiWo,
- refrigeration system approx. 400 m DN 15 - DN 80 flexible elastomeric foam,
- Thermal insulation RLT channels u. Moldings approx. 4500 m
- Cold insulation RLT channels u. Moldings approx. 710 m
- Round pipe and fittings DN 100 to 300 mm approx. 2 100 running meters, MiWo
Tract 3: Rehabilitation of lifts
- Complete reconstruction of 2 single elevators of a group of three each over 7 storeys including cabin, doors and control
- Complete disassembly and disposal of a single lift over 8 storeys
Unit 4: Roofing and roof sealing work with dismantling of flat roof superstructures
- about 1 600 m
- about 1 600 m
- Approx. 120 meters of attic covers aluminum, powder-coated.