Construction of a construction road as a preliminary measure for the construction of the Reisen viaduct and the Berkersklamm tunnel as part of the new construction of the B 38 Mörlenbach bypass
approx. 23,000 m³ of soil loosening and installing
Carry out approx. 100,000 m² of qualified soil improvement
Produce approx. 2,000 m³ of frost protection layer
approx. 7,000 m² of AC 22 TS
approx. 7,000 m² of AC 16 BS
Produce approx. 7,000 m² of AC 11 DS
Make 1 piece of temporary bridge