NRW.URBAN is active in the OSTPARK project as a trustee of the city of Bochum.
In the course of further development and gala construction work, a next development section, Havkenscheiderpark + Height, is to be advertised. The work includes civil engineering for the construction of rainwater and waste water drains and the trades to create the HAVKEN-Scheider Park.
A lot with:
Overall, the following are to be laid on waste water ducts:
Approx. 300 m DN 250, PVC-U
Approx. 110 m DN 300, PVC-U
approx. 20 m DN 400, B
approx. 5m DN 700, B
approx. 50 m DN 150, PVC-U
including shaft structures.
Overall, the following must be laid on rainwater channels:
approx. 65 m concrete pipes, DN 600
approx. 50m concrete pipes, DN 800
approx. 330 m concrete pipes, DN1000
including shaft structures.
Production of
approx. 24,000m3 of ground work
approx. 13,000m3 topsoil work
approx. 1,500 water-thickeners
approx. 2,100 m2 of asphalt support and topcoat
approx. 310m2 bottom filter, approx. 430 t filter material
Approx. 4300 m2 of film waterproofing
approx. 1400m2 lawn seeding
approx. 1,700 t of greywacke hydraulic components
approx. 140 m railing/handrail
approx. 1.7 t bridge construction
approx. 60m3 retaining wall construction/foundations