Roofing work.
On the site of the red waiting school in Mühlheim, a new replacement building for the already abandoned primary school and a new care building are to be built. The foundation is carried out over a load-bearing base plate. The supporting structure of new buildings is made in solid construction (reinforced concrete). Non-load-bearing partitions in KS masonry or drywall. The window hinges are designed in aluminium construction as a window and PR construction. It
There is a change of fixed glazing and opening window sashes. The closed façade parts on the ground floor and upper floor are insulated and clad with an ETICS. An external sun shade provides summery thermal protection.
Key data for the building:
— Building class: Building class 3, special building,
— Built-up area: approx. 3 800 sqm,
— Storey: 1-3 storeys,
— maximum height over terrain: approx. 10 m.