Specialist planning Technical equipment for the replacement AOC.
Further documents are available, they can be downloaded from www.evergabe.nrw.de
Specialist planning Technical equipment Equipment groups 1,2,3,4,5,6,7,8 (service phases 1-3, (4), 5-9) for the II. 1.4. construction measure mentioned)
The commissioning is optionally carried out gradually.