Rehabilitation in the area of sections 3 and 4 of the L 160 road in full construction, including slope stabilization by reinforced concrete edge beams on large and micro bored piles, as well as earth reinforced with geotextiles.
Rehabilitation in the area of sections 3 and 4 of the L 160 road in full construction, including slope stabilization by reinforced concrete edge beams on large and micro bored piles, as well as earth reinforced with geotextiles.
ca. 12,500 m3 earthworks, partly soil replacement
ca. 4,400 m3 of frost protection layer 0/45
ca. 11,800 m2 asphalt base course made of AC 32 TS
ca. 11,800 m2 asphalt binder course made of AC 16 BS
ca. 12,500 m2 asphalt surface course made of AC 11 DS
like. 4.000 m Fahrbahnmarkierung
ca. 650 m concrete edge beams on micro bored piles,
ca. 275 m concrete edge beams on large bored piles D = 90 cm,
ca. 290 m reinforced earth with geotextile layers and soil exchange
like. 11.2000 m Mikrobohrpfähle
like. 1.410 m Großbohrpfähle