Car park building construction work | Tenderlake

Car park building construction work

Contract Value:
EUR 5M - 5M
Notice Type:
Contract Notice
Published Date:
19 May 2023
Closing Date:
26 June 2023
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DEB RHEINLAND-PFALZ (DE Germany/DEUTSCHLAND)
DEB1 Koblenz (DE Germany/DEUTSCHLAND)
DEB12 Ahrweiler (DE Germany/DEUTSCHLAND)
Description:
Construction of a multi-storey car park (large open garage)

Planning and construction of a multi-storey car park

Composite steel skeleton construction car park as large open garage on 8 half-levels:

Bruttorauminhalt (BRI):ca. 26.925 m3

Gross floor area (GFA): approx. 11,345 m2

Length: approx. 84.60 m (incl. stairwells approx. 87.46 m)

Width : approx. 33.30 m

Stellplatzbreite : 2,70 m

Column grid : 2.50-2.70m; Driving and parking areas without supports

Fahrgassenbreite : ≥ 6,00m

Floor height : ≥ 2.75 m

Clear floor height :≥ 2.10 m

Number of parking levels (split-level): 8 (levels -1 to 6; Access level = 0)

Number of parking spaces :≥ 401, of which 15 are disabled parking spaces

Traffic loads: 3.5 kN/m2 on the parking decks; 5.0 kN/m2 on ramps

Bicycle parking area: separated on level 0 with alternating high-low setting for approx. 25 bicycles

Staircases: 2 external reinforced concrete staircases with glass façade on one side

Elevator system: 1 passenger elevator, handicapped accessible

Façades: approx. 1,185 m2 wooden façade areas made of vertical larch wood beams 80/180mm set on a gap (120 mm)

approx. 60 m2 PV module façade incl. Accessories

Remaining façade surfaces open or parapet grille with impact protection

Equipment: Barrier systems for 2 x entry and 2 x exit each

2 St. Zahlautomaten

Parking guidance system with single space detection

≥ 134 parking spaces with cable infrastructure for electromobility (according to GEIG)

10 electric charging points

complete electrical installation incl. lighting

complete signage, marking work and escape route marking

Fire protection: Extinguishing water underground tank, usable volume at least 96 m3 incl. Accessories

dry risers in both stairwells

Semi-stationary spray water extinguishing system in the façade area

Download full details as .pdf
The Buyer:
Stadtverwaltung Bad Neuenahr-Ahrweiler
CPV Code(s):
45213312 - Car park building construction work