The project consists of the construction of underground MV feeders at the Nord Deux-Sèvres source substation and the Chapelle Gaudin distribution post, in the municipality of Saint-Maurice-Étusson.
Construction of three underground MV network feeders between the Nord Deux-Sèvres source substation and the Chapelle Gaudin distribution substation:
- straight from Migaudon: 9,000 m (PSNRDS – PRGaudin);
- straight from Noirlieu: 12,500 m (PSNRDS – PRGaudin + resumption of the MV network in bypass);
- linear departure from Coulonges: 9,000 m (PSNRDS – PRGaudin);
- Linear HT Aerial drop-off: 8,250 m.
Composition of the book:
- a 3 * 240 Alu MV cable from Migaudon,
- a 3 * 240 Alu HTA cable from Noirlieu,
- a 3 * 240 Alu HTA cable from Coulonges,
- a 3 * 150 Alu MV cable bypass from Noirlieu,
- a remote-controlled four-way MV cutoff point,
- four 4UF heat pumps,
- two PSSA,
- five AC3M.